Skip to content

This is how the underpass is being built in Sanga (seven photos)

Kalopati

16 minutes ago

Kathmandu. The Suryabinayak-Dhulikhel road section, which was being upgraded to 6-lane for the past three years, is currently under construction. Currently, the road is two-lane.

The underpass is being constructed on the same road section. The total length of the underpass is 1,110 meters. The underpass includes 190 metres approach road towards Banepa and 900 metres towards Bhaktapur. It will be 6 meters high and 10.5 meters wide. A 20-meter bridge will also be constructed inside the underpass.

Leave your comment